Existing Power Plants



NoPower Plant
Completion of_Construction
Catchment area(Sq.km)
Dam Height(m)
Dam Crest_Length
Dam Type
Storage_Capacity of_the_reservoir_(Mm3) at_max.level
Cross section of Penstock/TunnelPower House
1Beles201014,20035 125 Concrete gravity dam on Natural lake 37,3076m(vertical), 5.6m(horzontal)
2Tekeze200930,390188 450 Arch gravity 9,310
3Gibe II2009weir46.5 171.13 weir weirnumber(2),3.6m down to 2.8m, length(1.2km)
4Gibe I20045141 1700 Asphalt faced rock fill 6685m(diameter),408m length83mx22.5mx40m
5Wakena19885,300422000 Earth and Rock fill 763Legthe(300m). Diameter (4.2m)
6Fincha197217022.2 340 Earth and Rock fill 4062.1m(dia)
7Finchaa Amerit Neshe201129.538 1000 Earth dam 2.332.1m(dia)
8Tis Abay I195315,300weir weir weir 910033*1500
9Tis Abay II200115,300weir weir weir 91004.6m(dia)
10Koka196020023.8 458 Concrete gravity dam 1500Number(3),length (50.7/55.4/61.5m), Diameter(3.5)
11Awash 219652.73(weir)10 88 Concrete gravity dam 22.4Number(2), length(300m)
12Awash 319710.063(weir)20 125 Concrete gravity dam 22.4Number(2), length(260m), Diameter 7m
13Sor1990
14Yadot1990
15Dire Dawa2004
16Awash 7kilo2004
17Kality2004
18Aluto1970
19Adama wind2012
20Ashegoda2012
21Adwa